Real Time Continuous Treated Sewerage Water Quality Monitoring Stations.

2MLD Ulsoor STP CHIKKABANAVARA 5 MLD KADUGODI 6 MLD STP HORAMAVU 20 MLD K AND C VALLEY 60 MLD NAGASANDRA 20 MLD RAJACANAL 40 MLD
Parameters 2025-06-12 01:00:00 2025-05-28 21:15:00 2025-06-12 00:30:00 2025-06-12 00:45:00 2025-06-12 00:47:30 2025-05-10 15:45:00 2025-06-12 01:00:00 Limit Unit
pH 7.24 7.87 8.01 7.59 6.65 7.12 7.67 6.5-9.0 pH
Temperature 26.90 23.20 22.60 29.40 27.40 30.00 27.30 24-27 °C
Ammonical Nitrogen 0.51 0.61 0.30 0.84 0.96 1.03 0.81 5 mg/l
Total Nitrogen 1.78 1.80 13.37 4.00 1.00 2.27 3.10 10 mg/l
COD 28.68 17.35 50.40 46.33 52.92 59.24 29.03 50 mg/l
BOD 6.31 2.34 6.77 10.74 13.81 1.81 3.65 10 mg/l
TSS 6.14 2.42 82.41 10.07 5.80 16.73 4.48 20 mg/l
Color 6.02 5.95 6.73 11.99 19.23 17.08 8.33 hu
Dissolved Oxygen 3.14 3.61 1.77 3.36 7.97 4.37 4.69 mg/l
Total Phosphorus - - - - - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
YELLAMALAPACHETTY 15 MLD BELLANDUR 90 MLD DODDABELE 20 MLD NAGASANDRA OLD 20 MLD 4MLD Cubbon Park TTP KADABEESANAHALLI 50 MLD STP Sarakki 5 MLD
Parameters 2025-06-10 16:15:00 2025-05-01 14:30:00 2025-06-12 00:45:00 2025-06-10 16:15:00 2025-06-12 00:45:00 2025-06-11 16:30:00 2025-06-12 00:15:00 Limit Unit
pH - 7.36 7.17 7.57 6.82 8.31 7.77 6.5-9.0 pH
Temperature 26.00 31.30 27.40 26.30 27.20 24.29 28.40 24-27 °C
Ammonical Nitrogen - 0.58 0.75 0.04 0.89 0.65 2.38 5 mg/l
Total Nitrogen - 5.20 3.10 0.06 4.00 1.75 4.76 10 mg/l
COD - 37.56 52.50 49.78 17.25 39.14 22.76 50 mg/l
BOD - 7.51 3.82 9.50 1.20 9.34 2.75 10 mg/l
TSS - 9.39 20.84 15.45 0.73 11.45 5.62 20 mg/l
Color - 7.89 14.42 0.00 3.79 7.18 4.55 hu
Dissolved Oxygen - 4.66 4.30 155.00 3.64 2.97 - mg/l
Total Phosphorus - - - - - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
Mailasandra STP 75 MLD 60 MLD V.Valley TTP KR Puram STP 20 MLD 1.5 MLD Lalbagh TTP 35MLD Agaram STP Chikka_Bagur_5_MLD_STP Yelahanka 10MLD TTP
Parameters 2025-04-05 13:15:00 2023-12-05 15:45:00 2025-02-11 14:38:30 2025-01-24 17:45:00 2025-06-12 00:45:00 2025-06-12 01:15:00 2025-06-12 01:15:00 Limit Unit
pH 7.82 6.87 7.20 7.34 7.33 5.32 7.47 6.5-9.0 pH
Temperature 27.90 23.10 24.90 25.30 25.50 25.40 26.00 24-27 °C
Ammonical Nitrogen 3.77 0.86 2.40 0.55 1.24 26.78 2.52 5 mg/l
Total Nitrogen 7.92 2.06 4.80 2.75 5.08 53.60 6.21 10 mg/l
COD 45.29 20.00 48.90 18.97 30.05 40.10 31.40 50 mg/l
BOD 9.47 1.75 7.56 1.14 5.13 8.50 2.60 10 mg/l
TSS 18.45 3.18 15.88 0.97 6.82 9.70 3.60 20 mg/l
Color - 4.55 6.85 - 6.60 17.00 6.26 hu
Dissolved Oxygen 3.30 1.53 2.58 3.76 - - -20.63 mg/l
Total Phosphorus - - - - - - 0.23 0.5 to 0.9 mg/l
Outlet Flow - - - - - - - mg/l
Inlet Flow - - - - - - - mg/l
40MLD OLD Rajacanal STP Hennur 1MLD TTP 4_MLD_Madiwala_STP 150MLD STP_K&C valley 20Mld KR Puram STP New 10 MLD STP HULIMAVU 40MLD Doddabele STP
Parameters 2025-06-12 01:15:00 2025-05-05 11:45:00 2025-06-12 01:15:00 2025-02-18 16:30:00 2025-06-12 01:00:00 2025-06-11 07:42:00 2025-06-12 01:00:00 Limit Unit
pH 7.56 6.92 7.16 7.24 7.38 7.97 6.76 6.5-9.0 pH
Temperature 25.90 29.60 26.90 - - - 28.20 24-27 °C
Ammonical Nitrogen 60.81 0.31 2.39 2.43 1.30 0.09 2.12 5 mg/l
Total Nitrogen 176.35 1.24 6.90 0.62 4.69 1.20 4.45 10 mg/l
COD 71.60 44.10 34.95 - 32.15 13.57 29.89 50 mg/l
BOD 9.20 3.60 4.29 7.64 5.69 0.82 6.24 10 mg/l
TSS 23.00 4.00 4.13 8.19 7.51 2.60 7.61 20 mg/l
Color 17.86 6.20 8.74 - 3.45 1.20 6.93 hu
Dissolved Oxygen 3.78 4.66 - - - - 2.94 mg/l
Total Phosphorus 30.41 0.06 - 0.62 - - - 0.5 to 0.9 mg/l
Outlet Flow - - - - 0.05 1.12 - mg/l
Inlet Flow - - - - 0.07 1.14 - mg/l

Flow Parameter Stations

  2 MLD Ulsoor INLET KR PURAM 20 MLD - OUTLET 1.5MLD Lalbagh TTP Outlet To Horticulture 1.5MLD Lalbagh TTP Outlet To Lake 4MLD Cubbon Park TTP Outlet Overflow 2MLD Ulsoor STP Outlet Flow
  2025-04-21 09:17:17 2023-09-14 16:42:00 2025-06-12 01:09:00 2025-05-17 15:39:00 2025-06-12 01:12:00 2024-01-16 18:33:00
  0.57 MLD 21.60 MLD 0.29 MLD 43.20 MLD 8.96 MLD 0.0 MLD

Flow Parameter Stations

  6 MLD Kadugodi 20MLD Nagasandra STP 20 MLD Doddabelle 15MLD Yellamalapachetty STP 5 MLD Chikabanavara 40 MLD Raja Canal 20 MLD Horamvu Agara 60 MLD KC Valley Hennur 1MLD TTP 4_MLD_Madiwala_STP
  2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2020-11-19 10:00:00 2025-05-05 11:45:00 2025-06-12 01:15:00
 Inlet 28.75 MLD 0.07 MLD 0.18 MLD 0.04 MLD 35.47 MLD 37.50 MLD 0.19 MLD 72.26 MLD - -
 Outlet 25.73 MLD 0.03 MLD 0.16 MLD 0.03 MLD 26.06 MLD - 0.16 MLD 52.91 MLD - -